Proj Info

Property Type FACTORY
Developer Sin Soon Lee Development Ltd
Road Bukit Batok Cres
Tenure 60 from 13/03/1997
TOP Date 05/2009
District 23
Postal Code 658065
 
Unit Info  
  • Comprising of a 30-storey office WCEGA Tower and a 9-storey WCEGA Plaza.

  • Sizes from 1593 sq.m. (17,147 sq.ft.) per floor.

  • Floor Loading Capacities
  • 2nd to 9th storey except Driveway & Ramp = 10 kN/m²
  • Driveway & Ramp = 13 kN/m²
  • RC Flat Roof with Car Park = 5 kN/m²

  • Structure Floor to Floor Height
  • 1st storey = 4.5 ~ 6.0 metres
  • 2nd to 9th storey = 6.0 metres

  • Windows
  • Aluminum framed windows with tinted glass. All units above the 58 AMSL building height constraint will be fully enclosed with fixed non-openable windows to comply with NEA’s requirements.

  • Doors
  • Timber Doors with quality lock sets to all units.
  • PVC Doors with quality lock sets to toilets, where applicable.
  • Electrically operated roller shutter to units, where applicable.

  • Ceilings
  • Off-form / Skim Coat to formwork joint areas with emulsion paint to all units.

  • External Walls
  • RC Wall / Clay Brick Wall / Hollow Block Wall/ Autoclaved Aerated Concrete Block Wall with skim coat / cement and sand plaster and weather shield emulsion paint finish, where applicable.

  • Internal Wall Finishes
  • Precast Wall / RC Wall / Clay Brick Wall / Hollow Block Wall/ Autoclaved Aerated Concrete Block Wall with skim coat / cement and sand plaster and emulsion paint finish, where applicable.
  • Ceramic Tiles finishes to toilet walls at 1.80 metres high.

  • Floor Finishes
  • Power float finish to concrete floors.
  • Ceramic Tiles finish to toilet floors with waterproofing.

  • Air Condition Ledges
  • Air Condition Ledges to all units.

  • Electrical
  • Unit no. #02-39 and #02-52 of 100 Amperes, 3 phase supply tap off unit.
  • Unit no. #03-13, #03-39, #04-13, #04-39, #05-13, #05-39, #06-13, #06-39, #07-13, #07-39, #08-13, #08-39, #09-13 and #09-39 of 150 Amperes, 3 phase supply tap off unit.
  • All other units of 60 Amperes, 3 phase supply tap-off unit.
  • Emergency Lighting including exit sign to each factory as required by authorities.

  • Fire Protection
  • Automatic Sprinkler System and Fire Alarm System in compliance with statutory requirement.
  • Dry Risers, hose reels and smoke extraction systems in common areas in compliance with statutory requirement.

  • Lifts
  • 6 Passengers Lifts (13 persons capacity).


  • Other Info  
    Nearby Amenities
    Schools
    Yusof Ishak Secondary School (676m)
    Bukit Timah Primary School (775m)
    Keming Primary School (1021m)
    Bukit View Primary School (1209m)
    Bukit View Secondary School (1262m)

     
    Facilities
    • WCEGA Tower: Office/warehouse/factory integration
    • Lift speed at one minute to the top floor
    • column-free
    • panoramic view
    • free parking
    • business hub concept
    • shuttle bus to Jurong East MRT. WCEGA Plaza: Direct vehicle access to all units
    • loading/unloading at your doorsteps
    • private parking space in front of all units
    • prominent frontage facing main road
    • 6m high ceiling
    • 6m high ceiling
    • strong architectural design
    • loading capacity of 10KN/m2
    • free parking.